Relocating an IVF Cryostore: Moving Tanks, Embryos and Gametes Without Losing a Sample
Most IVF laboratories move their frozen store once in a generation. A new building, a hospital redevelopment, a merger or a move to larger premises means every embryo, oocyte and sperm sample the clinic holds has to leave one room and arrive safely in another. Many of the patients behind those samples are not in active treatment, and some have not been in contact for years. Nobody gets a second attempt at a sample lost in a move, and few people on the team have done one before. That is why a cryostore relocation deserves the same planning as a laboratory build.
This guide sets out how laboratory managers and embryologists can plan a move so that every sample arrives identified, at temperature and accounted for.
Start with the regulator, not the removal company
In the UK, an HFEA licence is granted in respect of specified premises, and the HFEA publishes its decisions on variations of premises for licensed centres. A clinic moving its laboratory or its storage should therefore raise the move with the HFEA early and have its licence varied for the new premises before samples are moved. Clinics in other countries should check the equivalent requirement with their own competent authority at the start of the project, because approval timescales often set the date of the move rather than the other way round.
Count before you plan
Everything else depends on an accurate inventory. Before any dates are fixed, reconcile the storage records against what is physically in every vessel: each canister, cane, goblet and visotube, each straw and device, matched to a patient, a consent record and a position. Discrepancies found during a move are far harder to resolve than discrepancies found months before it. Our annual cryo storage self audit gives a structure for this, and the reconciliation also tells you exactly how much material has to travel, which decides how many shippers you need.
Move the samples or move the vessels?
There are two broad approaches. For a short move within the same building, some laboratories move vessels with their contents in place, on a roller base designed for the vessel, along a route that has been walked and measured in advance for lifts, ramps, door widths and floor loading. A full liquid nitrogen vessel is heavy, and tipping or jolting it puts both the contents and the people moving it at risk, so this only makes sense over short, level, controlled routes. Your vessel supplier should confirm whether a particular vessel is suitable for moving while filled.
For anything beyond that, including moves between buildings or sites, the usual approach is to transfer samples into charged dry shippers, move the shippers, and transfer the samples into vessels that are already filled and stable at the new site. Dry shippers hold samples in vapour phase with no free liquid, which makes them far safer to handle and transport than liquid filled vessels.
Sizing the shipper fleet
The number of shippers is set by the inventory, the canister format and how many trips the team can manage in a day. The CryoStork range runs from the compact CryoStork V2 to the CryoStork V10, and matching shippers to the canisters you already use avoids repacking samples into unfamiliar furniture on the day. Plan for more capacity than the count suggests, so that one shipper failing its charge check does not stop the move. Many clinics hire extra shippers for a relocation rather than buying a fleet they will rarely need again, and our guide to dry shipper hire or purchase sets out the trade off.
Every shipper should be fully charged and checked before it is loaded, carried upright in a protective case, and fitted with a cryogenic data logger with a PT1000 probe, so the clinic has a temperature record for every load. Our guide to how dry shippers work and what affects hold time explains why a shipper should never be loaded on the strength of the hold time printed on its label.
Commission the new store first
Nothing should arrive at a store that is not ready for it. The receiving vessels should be installed, filled, settled and monitored at the new site for long enough to confirm they are holding temperature and consuming nitrogen normally. Alarms and monitoring should be live, the liquid nitrogen supply should be in place, whether from bulk supply or a self pressurising dispenser, and the room should have been assessed with our oxygen depletion calculator and fitted with oxygen monitoring. A move is often a good moment to add capacity, and vessels such as the CryoNest XL and CryoNest XXL are worth considering if the existing store is close to full. Our article on the 55 year storage limit explains why most stores now need more room than they were designed for.
Identification and witnessing on the day
A move is a series of transfers, and every transfer is a chance for an identification error. Each load should leave with a list of exactly what it contains, be witnessed out of the old vessel and witnessed into the new one, and be reconciled against the inventory before the next load starts. Clinics using electronic witnessing should plan how it will work across both sites. Moving whole canisters or goblets rather than individual straws reduces handling and keeps related samples together.
People, timing and contingency
Plan the move for a period with no other laboratory pressure, keep teams small and named, and make sure everyone handling liquid nitrogen has cryogenic gloves and a face shield. Keep the old store running and monitored until the last sample has been reconciled at the new site, and agree in advance what happens if a vehicle is delayed or a shipper fails its check. Our guide to what goes wrong in cryogenic transport is a useful checklist for those contingencies.
After the move
Once the last load is in, complete a full reconciliation, keep the data logger records with the move documentation, and monitor the new vessels closely for the first weeks. The old vessels should be emptied, warmed and inspected before they are reused or disposed of, and a cryogenic equipment service at the new site gives a clean baseline for the store’s next decade.
Planning a relocation
If your clinic is planning a move, send us your current inventory by sample type, the vessels you have, the distance between the old and new store, and your target date. We will come back with a plan covering dry shippers, logging, protective cases, receiving vessels and nitrogen supply, drawing on our storage vessel range and more than 40 years of experience supporting IVF laboratories worldwide, with next day delivery on standard UK stock.
More from Cryolab
Tissue Bank Storage: Which Tissues Need Liquid Nitrogen, Which Do Not, and How to Lay Out the Store
A tissue bank runs several cold chains at once. This guide covers which tissues need liquid nitrogen vapour, how to separate quarantine from released stock, and how to size the vessels.
Cell Cryopreservation: A Cell Freezing Protocol From Flask to Vapour Phase, and Where Each Step Goes Wrong
A standard cell freezing protocol for mammalian cell lines, from harvest to vapour phase storage and thawing, with the equipment behind each step.