The earliest sign is a shortening fill interval with no change in workload, which is visible only in a written fill log. Later signs are condensation or frost on the vessel body rather than the neck, then rapidly accelerating boil-off. Temperature alarms fire last of all, because liquid nitrogen holds minus 196 degrees Celsius until it is nearly gone. Our article on the 72 hour vacuum failure timeline walks through every stage and the decision that matters at each one.