Treat it as a planned transfer. Commission the new vessel first: cool it down, confirm automatic filling, alarms and remote notifications work, and let it run empty until temperatures are stable. Only then start moving samples.
Move collections in batches, with two people witnessing each transfer, a new inventory position recorded for every sample, and reconciliation against the old inventory at the end of each batch. Keep transfer times short, use a transfer vessel or dry shipper for anything moving between rooms, and do not decommission the old vessels until every sample is accounted for. Our CryoBank series offers customisable rack layouts to plan positions in advance. See our guides to relocating a cryostore and large vapour phase stores.